This consultation closed on 11 November 2024. Thank you for having your say.
We received 131 pieces of feedback. This included submissions that came from:
Key feedback themes
Most people chose option three as their preferred playground concept.
They also preferred a natural colour scheme.
The top equipment choices were:
We decided to go with climbing option one.
Changes we made a result of your feedback
The developed design will feature a colour scheme inspired by the local Raiders Rugby League Club (red and yellow). We will also consider adding items that provide shade as part of the project.
What happens next
Hibiscus and Bays Local Board approved the concept design in December 2024.