What we are proposing


We want to upgrade the playground at Shepherds Park in Beach Haven and include a nature play area for ages 0-12.

You can download and view the Shepherds Park concept plan [27MB].

We have developed a concept design for the playground that looks to retain the existing:

  • footpaths
  • shade sails and poles

The swing equipment includes:

  • an additional swing bay
  • a variety of swing types.

We want to know which kind of swing you prefer.

Play equipment in the proposed concept design caters for:

  • sliding
  • balancing
  • creative/roleplay
  • climbing
  • spinning
  • rocking.


About the concept design

We developed the proposed playground and nature play concept designs following consultation with:

  • community groups
  • a local primary school
  • Kaipātiki Local Board.


What we want your feedback on

We would like to know what you think of the proposed concept design.


How you can have your say

To have your say, you can:

Shepherds Park playground concept design feedback
Freepost Number 190198
Auckland Council
Private Bag 92300
Victoria Street West
Auckland
1142.


When you can have your say

You can have your say from Monday 9 September to Friday 4 October 2024.


What happens next

We will finalise the design and invite contractors to tender for the construction between January and June 2025.

We aim to build the new playground between September and December 2025.