Shepherds Park concept design and nature play area

This consultation closed on 4 October 2024. Thank you for having your say.

We received 64 responses through our online survey and the in person drop-in session.

The online survey was open from 9 September to 4 October 2024. The drop-in session was held at Shepherds Park.

Main feedback themes

Feedback shows that:

  • 94 percent of people support all or most of the concept design
  • 81 percent would like to include play equipment for 8 to 12-year-olds
  • 57 percent of people prefer the rhombus twister play equipment
  • the basket swing was the most preferred swing type
  • there is significant support for both a smaller and larger nature play area in the park.

Changes made based on the feedback

The new concept design includes:

  • removing play area below the gum trees due to the risk of falling branches
  • replacing wildflower plants north of the park with native shrubs
  • adding a rhombus twister play equipment for 8 to 12-year-olds.

What happens next

Kaipātiki Local Board has approved the concept design for the project.

We have nearly completed a detailed project design. We will be inviting contractors to submit tenders for construction with works starting in September 2025.

Construction is expected to take around 12 to 16 weeks.