Leiden Reserve playground renewal
This consultation closed on 8 July 2024. Thank you for having your say.
We received 25 responses through our online survey. The survey was open from 18 June to 8 July 2024.
Around 167 people visited the site to view the concept design information.
Main feedback themes
Feedback shows that:
- 56 percent preferred concept design option 2 for the playground renewal
- 56 percent preferred a toddler slide instead of a timber springer or talking tubes
- 58 percent of people preferred installing more shade sails near the playground.
Changes made based on the feedback
The new concept design includes:
- a smaller slide for younger children
- a picnic table under the permanent shelter
- additional trees for shelter and shade.
What happens next
Kaipātiki Local Board has approved the concept design for the project.
We have nearly completed a detailed project design. We will be inviting contractors to submit tenders for construction with works starting in September 2025.
Construction is expected to take around 12 to 16 weeks.